1
/
of
6
YOUMAYSTORY
YOUMAYSTORY Hydraulic Brake Bleed Kit for Shimano,TEKTRO, MAGURA and Other Mineral Oil Brake Systems, Brake Fluid Change Hydraulic Kits, Including High Performance Brake Fluid Mineral Oil 120ml
YOUMAYSTORY Hydraulic Brake Bleed Kit for Shimano,TEKTRO, MAGURA and Other Mineral Oil Brake Systems, Brake Fluid Change Hydraulic Kits, Including High Performance Brake Fluid Mineral Oil 120ml
Regular price
$45.95 USD
Regular price
$60.99 USD
Sale price
$45.95 USD
Unit price
/
per
Taxes included.
Shipping calculated at checkout.
Couldn't load pickup availability
Brand: YOUMAYSTORY
Color: Yellow
Features:
- 【Versatile Compatibility】Suitable for both mountain and road bikes, and compatible with popular brands like Shimano, Tektro, and Magura brakes. Whether you're a cross - country rider or a road - racing enthusiast, this bike brake bleed kit is your go - to tool.
- 【High - Quality Mineral Oil Brake Fluid】Comes with 2 bottles of 60ml mineral oil brake fluid, offering long - lasting and smooth lubrication for your bicycle brakes. This high - grade fluid is essential for an efficient brake bleed kit, ensuring optimal braking performance and reducing wear on brake components.
- 【Complete Brake Bleeder Kit Accessories】Equipped with 12 injection fittings for various brake models, 2 syringe barrels with oil scale for accurate brake fluid injection, and 1 large - capacity funnel for easy refilling. This comprehensive brake bleeding kit has everything needed for a hassle - free brake fluid bleeding process.
- 【Easy to Use Brake Fluid Bleeder】The well - designed syringe barrels with clear oil scales make it simple to control the amount of brake fluid injected, while the large - capacity funnel allows for quick and clean refilling. Even if you're new to bike maintenance, this brake fluid bleeder kit enables you to easily keep your brakes in top condition.
- 【Essential for Cycling Enthusiasts】As a cyclist, maintaining your bike's brakes with a reliable brake bleed kit is crucial for safety and performance. Our universal bicycle brake bleed kit is a must - have in your bike maintenance toolkit, ensuring your brakes are always ready for your next adventure. Scan the QR code on the manual to get the brake oil change video tutorial.
Binding: Apparel
Package Dimensions: 7.5 x 3.8 x 2.3 inches
Share
